DEFINITION
"Housing Developments" include single-family homes, multifamily homes, condominiums, and apartments of ten units or more.
GENERAL REQUIREMENTS 
|
|
1.
|
Peak Storm Water Runoff Discharge Rate: Post-development peak storm water runoff discharge rates shall not exceed the estimated pre-development rate for developments where the increased peak storm water discharge rate will result in increased potential for downstream erosion. |
|
2.
|
Conserve natural and landscaped areas. |
|
3.
|
Provide planter boxes and/or landscaped areas in yard/courtyard spaces. |
|
4.
|
Properly design trash storage areas to provide screens or walls to prevent off-site transport of trash. |
|
5.
|
Provide proof on ongoing BMP maintenance of any structural BMP's installed. |
|
6.
|
Design Standards for Structural or Treatment Control BMPs:
Post-construction treatment control BMPs are required to incorporate, at minimum, either a volumetric or flow based treatment control design or both, to mitigate (infiltrate, filter or treat) storm water runoff. |
OTHER CATEGORIES
FOR ADDITIONAL INFORMATION
A complete handbook titled "Development Best Management Practices Handbook, Part B Planning Activities" describing the above requirements in detail is available here.
|
|